It’s now T-1

Finally. Fingers crossed. It’s time to start (re)building the front cabin. Il Capitano did the logistics – getting the materials to MS Cava.


It will be a temp. construction. Kind of a prototype. To see what’s what. First up was to move and install pumps/electronics. By now we (as in Chief Engineer) only have one or two “wash-downs” to do before the temp. floor and bunks can be installed.

Please don’t tell Jørn. It’s made in OSB, which, quote: “should never/ever be used”..

Leave a Reply

Your email address will not be published. Required fields are marked *